Beer Study Buddy
← Back to syllabus topics

Advanced Cicerone® · Keeping and Serving Beer

Draft system components

Syllabus Path

A draft system has three subsystems: the pressure side that supplies and regulates gas, the beer side that carries beer from keg to faucet, and the cooling side that holds it cold on the way. Advanced candidates know the function and anatomy of each part, from gas cylinders, nitrogen generators, blenders, and regulators through couplers, FOBs, trunk lines, and restriction devices to the seven faucet types, and use that map to place any dispense symptom in the right part of the system.

  1. I. Keeping and Serving Beer
  2. E. Draft systems
  3. 1. Draft system components

Study Guide

Read the full study guide: Complete Guide to Draft Beer Systems

Exam Focus

  • Name the function of each pressure-side, beer-side, and cooling component, including coupler systems, and recognize the faucet types in use.
  • Trace gas and beer through cylinder, regulator, manifold, keg, coupler, FOB, beer line, cooling path, tower, shank, and faucet.
  • Locate a dispense symptom within the gas, product, cooling, or point-of-service path before opening or replacing components.

Pressure side

ComponentJob
Gas cylinder or bulk tankStores CO2; bulk tanks of liquid CO2 suit high-volume venues
Nitrogen generatorSeparates nitrogen from air for blending on site
Air compressorNever for traditional kegs; can push bag-in-keg kegs and power beer pumps
Gas blenderMixes CO2 and nitrogen in a set ratio
Beer pumpAdds force to move beer through high-resistance systems
Gas distributor or manifoldSplits gas to several kegs
Primary and secondary regulatorsThe primary cuts cylinder pressure to a working level; secondaries set each keg or brand
Gas lineCarries gas to the coupler
CouplerAdmits gas to the keg and takes beer out; its check valve keeps beer from backing into the gas line

Couplers and kegs

Kegs are stainless steel or single-use. Couplers come in seven systems: A, D, G, M, S, U, and KeyKeg. D is the standard in the US, S is common on European lagers, A on many German brewery kegs, U on Irish stouts and ales, G on some British ales, M on a few German brands, and KeyKeg kegs need their own coupler. A coupler that does not match the keg valve will not engage, so a mixed import list needs a matching set. If beer ever backs into a gas line because a check valve failed, that gas line is replaced.

Beer side and faucets

From the keg, beer passes through the coupler and a jumper line, often a FOB (foam on beer detector, which stops flow when a keg empties so the line stays packed with beer), and a wall bracket, the fixed mounting point in the cooler where jumper lines connect to the lines leaving for the bar, and then a trunk line or python, an insulated bundle of beer and glycol lines, to the draft tower and faucet. Bulk serving tanks replace kegs in some high-volume venues. Beer line may be vinyl, which lets oxygen through and is replaced every 1-2 years, barrier tubing that resists oxygen and flavor pickup, or stainless. Choker line or other restriction devices near the tower add resistance.

  • Standard faucet: shuts off at the rear of the body, so the body drains and needs regular cleaning.
  • Nitro faucet: forces beer through a restrictor plate to create the cascade and dense head.
  • Flow control faucet: an adjustable lever adds resistance to slow the pour.
  • Ventless faucet: seals at the front, so beer stays in the body rather than drying inside it.
  • European, roto, and Czech-style side-pull faucets: designs common on imported and regional systems; each is disassembled and cleaned on the same schedule as any faucet, and the side-pull type can pour liquid beer or dense foam depending on how the handle is worked.

Cooling side and tracing a symptom

Cooling components are the glycol power pack or chiller, the trunk line or python, and the blower fan on air-cooled systems. With all three subsystems mapped, a symptom points to a path:

SymptomPath to check firstComponents
No beerPressure side, then kegEmpty gas, closed valves, regulator, coupler engagement, tripped FOB
Foam on the first pour after a pauseCooling sideTower cooling, blower, glycol loop
Foam on every pourCooling, then beer sideBeer temperature, kinked line, restriction, faucet, coupler seals
Beer in the gas lineCouplerFailed check valve; replace the gas line

Why It Matters

  • Knowing each component's job is the fastest route from a symptom to its cause.
  • Coupler systems and gas equipment decide which products a venue can pour at all.
  • Faucet and line choices affect hygiene, foam, and oxygen pickup long after installation.

Practical Sensory Exercises

Gas-to-glass map

Walk a working draft system from the gas supply to one faucet and sketch every component in order. Label each as pressure, beer, or cooling side, name its job, and mark where you would look first for no beer, steady foam, and foam only on the first pour.

Key Terms

Secondary regulator
A regulator after the primary that sets pressure for an individual keg or brand.
Gas blender
A device that mixes CO2 and nitrogen in a fixed ratio for dispense.
Nitrogen generator
Equipment that separates nitrogen from compressed air for on-site blending.
Coupler check valve
A valve in the coupler that stops beer from flowing back into the gas line.
FOB
Foam on beer detector; it stops flow when a keg empties so the line stays full of beer.
Python
An insulated trunk line bundling beer lines with coolant lines.
Barrier tubing
Beer line with a lining that resists oxygen transfer and flavor pickup.
Flow control faucet
A faucet with an adjustable restrictor that slows the pour.

References

4 available